Skip to content
Gigantum.net

Search

Search covers the most recently published. For the full archive, browsethe topics.

40 results for"Oct 11 to 20"

Garmin claims up to 320 hours of activity tracking with its new solar smartwatch.

The Apple Watch Ultra 4 can run for up to 84 hours between charges, but Garmin’s new $899.99 Enduro 4 can track your activities for up to 320 hours or function as a basic smartwatch for up to 90 days. Instead of squeezing in a massive battery, the Enduro 4’s sapphire-protected touchscreen has an integrated solar panel so extending its battery life requires daily sun exposure. [Image: https://platform.theverge.com/wp-content/uploads/sites/2/2026/10/garmin1.jpg?quality=90&strip=all] [Image: https://platform.theverge.com/wp-content/uploads/sites/2/2026/10/garmin2.jpg?quality=90&strip=all]

Cable lobby groups plan to sue the FCC to try and stop the end of the national ownership cap rule.

Brendan Carr’s FCC voted to end the the rule, which prevents a broadcast station from reaching more that 39 percent of US TV households, in August. The lobby groups say that the order “arbitrarily and capriciously ignores the harms that will surely follow from allowing broadcast station groups to exceed the National Cap,” Ars Technica reports. [Link: Cable lobby to sue Trump FCC over repeal of national TV ownership cap | https://arstechnica.com/tech-policy/2026/10/cable-lobby-to-sue-trump-fcc-over-repeal-of-national-tv-ownership-cap/ | Ars Technica]

In 2014, Massachusetts built State Route 7A’s rail overpass with stacked soil-and-fabric walls, cutting the $1.1 million project cost by 49%

In 2014, Massachusetts revolutionized bridge construction by using Geosynthetic Reinforced Soil-Integrated Bridge Systems (GRS-IBS) for the State Route 7A project, resulting in a 49% cost reduction. This innovative approach minimized disruption, accommodated a skewed bridge over an active railroad, and showcased effective monitoring methods post-construction.

Supreme Court weighs case over Air Force detonating munitions in Guam

The Supreme Court on Wednesday wrestled with a case about whether the Air Force needs to conduct environmental review before its munitions detonations in Guam. An environmental group, Prutehi Guåhan, has sued, saying that the decision to file a permit renewal application with the Guam Environmental Protection Agency (EPA) constitutes an agency action that triggered…

Wednesday, October 7, 2026

© 2026 Gigantum.net. Content gathered automatically from external sources; rights to each text belong to whoever originally published it.