In 2011, Iowa built US 6’s Keg Creek bridge off-site and installed it in 16 days; the project cut total costs by $440,000
In 2011, Iowa's Keg Creek Bridge project revolutionized bridge construction by significantly reducing road closure time from six months to just 16 days, resulting in a $440,000 overall cost saving. Discover how prefabricated bridge systems are the future of infrastructure in this detailed analysis.