In 2001, the Indian Mesa wind farm began operating in Pecos County with 125 turbines; sheep grazing continued, and $930,000 was paid in school taxes
In May 2001, the Indian Mesa wind farm began operating in Pecos County, West Texas, with 125 turbines and a total installed capacity of 82.5 MW.