In Alberta, Canada built an instrumented road with about 825,000 scrap tyres and waste bottom ash, reportedly saving 103,123 m³ of landfill space
Discover how engineers in Edmonton, Alberta, constructed a revolutionary road using nearly one million scrap tires and waste bottom ash, significantly reducing landfill waste and optimizing frost-resistant pavement conditions.
Winters in Edmonton are long and cold, and a road there has to cope with ground that freezes deep and then thaws unevenly in spring. Frozen soil under pavement can heave, and as it thaws, it loses strength, so engineers in cold regions look for ways to keep frost away from the soil that supports a road. Meanwhile, scrap tyres accumulate in large numbers, and burning coal for electricity leaves a residue called bottom ash that has to be put somewhere. Researchers at the University of Alberta set out to test whether both materials could go into a single road. They built one that reports its own condition through sensors embedded in the pavement.How the 2012 test road in Edmonton was built and instrumentedThe Integrated Road Research Facility (IRRF) at the University of Alberta, founded in 2012, describes its test road as unique in Canada. The road links the Edmonton Waste Management Centre with Anthony Henday Drive (Highway 216). The road was built with scrap tyres and waste bottom ash and carries more than 250 geotechnical, environmental and pavement sensors, whose data an automated system sends over the Internet to the university laboratory. The IRRF project description states that more than 8,000 tonnes of recycled tyres, about 825,000 scrap tyres, were processed into tyre-derived aggregate and used to build the road. The same description lists three main research areas: tyre-derived aggregate and tyre-soil mixtures as embankment materials, flexible pavement performance in cold weather, and insulated pavement sections using polystyrene boards, bottom ash and tyre-derived aggregate.Landfill savings of 103,123 m³ reported for the Edmonton test roadThe IRRF reports that building the road diverted these tyres from Edmonton’s landfill and saved approximately 103,123 m³ of landfill space. The first published field results came from Negar Tavafzadeh Haghi and colleagues in Using Field Data to Evaluate Bottom Ash as Pavement Insulation Layer, which appeared in Transportation Research Record in 2014.According to the paper, instrumentation took place at various depths in Edmonton, Alberta, and frost depth, freezing, and thawing duration were evaluated using temperature data from October 2012 to June 2013. From the field data, the authors estimated thermal resistivities (R-values) of 1.4 m²°C/W for bottom ash and 16.7 m²°C/W for polystyrene, and the insulation layers reduced frost depth by at least 28% and 40%, respectively, compared with the control pavement section.Frost depth cut by 24% with bottom ash and 64% with polystyrene in the 2021 studyYunyan Huang and colleagues revisited the road eight years after construction in Performance Evaluation of Different Insulating Materials using Field Temperature and Moisture Data, published in Transportation Research Record in 2021. The study took measurements on three 20 m insulated segments and one control segment. Field temperature and moisture gauges were used to compare the 100 cm bottom ash layer with the 10 cm polystyrene board. It was found that the maximum frost depth for the control segment was 2.10 m, 1.60 m with bottom ash, and 0.75 m with polystyrene insulation, a decrease of 24% and 64%, respectively.You use AI every day. Now get your AI Quotient. Take the AIQ test.
Topics in this story
Gathered from external sources. Rights to this text belong to whoever originally published it.